The project involves the structure of a transport bridge and accompanying auxiliary facilities within the Veitsch-Radex refractory products plant.
The transport bridge is approximately 90 meters long. The lower support is at a height of 25 m, and the higher at 26.5 m. The main load-bearing structure, including the columns and bridge girders, was built as a truss system.
Anti-corrosion protection was carried out using the hot-dip galvanizing method.