{"id":1056,"date":"2025-06-24T23:31:08","date_gmt":"2025-06-24T21:31:08","guid":{"rendered":"https:\/\/exbc.rs\/projekat\/istovarna-stanica-za-vagone-tent-b-obrenovac\/"},"modified":"2025-07-03T19:49:56","modified_gmt":"2025-07-03T17:49:56","slug":"railcar-unloading-station-tent-b-obrenovac","status":"publish","type":"projekat","link":"https:\/\/exbc.rs\/en\/project\/railcar-unloading-station-tent-b-obrenovac\/","title":{"rendered":"Railcar unloading station, TENT B, Obrenovac"},"content":{"rendered":"<h3>Scope of work:<\/h3>\n<p>Production and installation of the steel structure \u2013 57 tons<\/p>\n<h3>Description<\/h3>\n<p>The structure has base dimensions of 12 x 26 meters, with a ridge height of 10 meters. It is designed as a steel (tunnel-type) canopy, open on the gable sides to allow the passage of trains delivering limestone.<\/p>\n<p>The main load-bearing structural system consists of columns rigidly connected to a beam.<\/p>\n<p>Anti-corrosion protection was carried out in accordance with exposure class C4 and a required durability of 15\u201325 years.<\/p>\n","protected":false},"template":"","meta":[],"categories":[23],"class_list":["post-1056","projekat","type-projekat","status-publish","hentry","category-industrial-facilities"],"acf":[],"_links":{"self":[{"href":"https:\/\/exbc.rs\/en\/wp-json\/wp\/v2\/projekat\/1056","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/exbc.rs\/en\/wp-json\/wp\/v2\/projekat"}],"about":[{"href":"https:\/\/exbc.rs\/en\/wp-json\/wp\/v2\/types\/projekat"}],"wp:attachment":[{"href":"https:\/\/exbc.rs\/en\/wp-json\/wp\/v2\/media?parent=1056"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/exbc.rs\/en\/wp-json\/wp\/v2\/categories?post=1056"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}