{"id":1145,"date":"2025-07-11T14:10:41","date_gmt":"2025-07-11T12:10:41","guid":{"rendered":"https:\/\/exbc.rs\/projekat\/padel-city-novi-sad\/"},"modified":"2025-08-06T16:57:18","modified_gmt":"2025-08-06T14:57:18","slug":"padel-city-novi-sad","status":"publish","type":"projekat","link":"https:\/\/exbc.rs\/en\/project\/padel-city-novi-sad\/","title":{"rendered":"Padel City, Novi Sad"},"content":{"rendered":"<h3>Scope of work:<\/h3>\n<ul>\n<li>Design, fabrication, and installation of the steel structure \u2013 60 t<\/li>\n<li>Installation of facade PIR panels \u2013 1,600 m\u00b2<\/li>\n<li>Installation of roof PIR panels \u2013 1,000 m\u00b2<\/li>\n<\/ul>\n<h3>Specifics:<\/h3>\n<ul>\n<li>Due to the large roof area, rainwater collection and drainage required the installation of a valley and its substructure.<\/li>\n<\/ul>\n<h3>Description<\/h3>\n<p>The building has base dimensions of 38 x 24.5 meters, with a ridge height of 14 meters.<\/p>\n<p>The main load-bearing structural system consists of columns connected by a lattice beam.<\/p>\n<p>Anti-corrosion protection was carried out using alkyd coatings with a total thickness of 80 microns, with columns additionally protected by fireproof coating rated for 30 minutes.<\/p>\n","protected":false},"template":"","meta":[],"categories":[27],"class_list":["post-1145","projekat","type-projekat","status-publish","hentry","category-sports-halls"],"acf":[],"_links":{"self":[{"href":"https:\/\/exbc.rs\/en\/wp-json\/wp\/v2\/projekat\/1145","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/exbc.rs\/en\/wp-json\/wp\/v2\/projekat"}],"about":[{"href":"https:\/\/exbc.rs\/en\/wp-json\/wp\/v2\/types\/projekat"}],"wp:attachment":[{"href":"https:\/\/exbc.rs\/en\/wp-json\/wp\/v2\/media?parent=1145"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/exbc.rs\/en\/wp-json\/wp\/v2\/categories?post=1145"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}