{"id":1399,"date":"2025-08-06T21:30:56","date_gmt":"2025-08-06T19:30:56","guid":{"rendered":"https:\/\/exbc.rs\/projekat\/kotlarnica-aerodrom-nikola-tesla-beograd\/"},"modified":"2025-08-06T21:33:46","modified_gmt":"2025-08-06T19:33:46","slug":"heating-plant-nikola-tesla-airport-belgrade","status":"publish","type":"projekat","link":"https:\/\/exbc.rs\/en\/project\/heating-plant-nikola-tesla-airport-belgrade\/","title":{"rendered":"Heating plant, Nikola Tesla Airport, Belgrade"},"content":{"rendered":"<h3>Scope of work:<\/h3>\n<ul>\n<li>Fabrication and installation of the steel structure &#8211; 65 t<\/li>\n<li>Installation of R FTV fa\u00e7ade panels &#8211; 985 m\u00b2<\/li>\n<li>Installation of PIR roof panels &#8211; 870 m\u00b2<\/li>\n<li>Complete metalworking and locksmith works<\/li>\n<\/ul>\n<h3>Description<\/h3>\n<p>The new boiler room facility has a footprint of 39 x 18 m and a ridge height of 10 m.<\/p>\n<p>The primary load-bearing system consists of columns connected by planar lattice girders.<\/p>\n<p>Anticorrosive protection was carried out using alkyd coatings with a total thickness of 130 microns. The main structural elements were additionally protected with fire-resistant coating rated for 30 minutes, except for the columns, which are protected for 60 minutes.<\/p>\n","protected":false},"template":"","meta":[],"categories":[23],"class_list":["post-1399","projekat","type-projekat","status-publish","hentry","category-industrial-facilities"],"acf":[],"_links":{"self":[{"href":"https:\/\/exbc.rs\/en\/wp-json\/wp\/v2\/projekat\/1399","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/exbc.rs\/en\/wp-json\/wp\/v2\/projekat"}],"about":[{"href":"https:\/\/exbc.rs\/en\/wp-json\/wp\/v2\/types\/projekat"}],"wp:attachment":[{"href":"https:\/\/exbc.rs\/en\/wp-json\/wp\/v2\/media?parent=1399"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/exbc.rs\/en\/wp-json\/wp\/v2\/categories?post=1399"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}